MorCapOperational Capacity & Resilience
Not connected

Sign in to record and review capacity snapshots, freezer demand and estate resilience.

Reporting foundations

Add Assessment Schedule Rule

Expected days

Metrics Engine

Metric definition

Reference

About MorCap metrics

Plain-English definitions for the metrics and statistical terms currently used by Reporting & Intelligence.

Physical plant

Add a fridge or freezer bank

Use the letter or bank identifier approved by Estates/Engineering. The application will not invent or advance the plant letter.

Whole-bank control

Change bank status

Estate configuration

Edit bank configuration

Individual space control

Change space status

Operational configuration profile

Choose bank configuration

Before this assessment

Confirm the operational estate

Any bank suspension, reinstatement, individual-space restriction or configuration-profile change must be recorded before scanning begins.

Commission capacity

Add spaces to a bank